Lanai Construction
← All Services

Lanai Construction That Extends Your Florida Living Space

Insured & Workers' Comp
Est. 2017
Free Estimates

In Florida, the lanai is an extension of your home. HR Concrete Services builds the concrete and block foundation for custom lanais and patios across St. Petersburg, Clearwater, and the Tampa Bay area — creating the outdoor living space you've always wanted.

A properly built lanai starts with the right foundation: engineered footers, level block walls or knee walls, and a smooth, properly sloped concrete slab. We handle all the concrete and masonry work that creates the structural base for your screen enclosure, roof, and finishes.

Our lanai construction includes footer excavation and pour, CMU block knee wall or full wall construction, slab-on-grade pour with proper drainage slope, and anchor bolt installation for the screen or roof structure. We coordinate with screen enclosure contractors and roofers to ensure seamless handoffs.

We've built lanais ranging from simple 10x12 covered patios to expansive outdoor living areas with full kitchens and pool access. Whether you're adding a lanai to an existing home or building one as part of new construction, we deliver the structural foundation that makes everything else possible.

Every lanai project in Pinellas County requires permitting. We work within the local building code requirements and schedule all required inspections so your project stays on track and fully compliant.

Why Choose HR Concrete

Complete footer, block & slab construction
Proper drainage slope engineering
Anchor bolt installation for enclosures
Coordination with screen & roof contractors
Permit handling & inspection scheduling
Insured with full workers' compensation

Frequently Asked Questions

Do I need a permit to build a lanai in Pinellas County?

Yes. Lanai construction requires a building permit in Pinellas County. We handle the permitting process and coordinate all required inspections.

Can you build a lanai attached to my existing home?

Absolutely. Most of our lanai projects are additions to existing homes. We tie into your existing structure per engineering requirements.

How long does lanai construction take?

The concrete and block work phase typically takes 1-2 weeks depending on size and complexity. The screen enclosure and finishing work are handled by other trades after we complete our portion.

What about drainage under the lanai?

Proper drainage is critical. We slope the slab away from your home and toward designated drainage points to prevent water pooling.

Ready to Start Your Project?

Contact us today for a free, no-obligation estimate. We'll visit your property and provide a detailed quote.